Complex Lines In Tight Spaces
Hot Catalyst Withdraw Line
In 2018, REDD worked with a client in Wyoming to analyze a pipe line. REDD was asked to analyze the best route, material, and supports for this new pipeline to reduce the stresses on the pipe.
This project proved uniquely challenging due to the fact that there was limited room in which REDD could place this design to work properly in between the already placed equipment. REDD also had to dig deep into it’s knowledge base to fully understand metallurgy of the materials used to ensure that it would be able to handle the temperatures and bends of the pipe.
REDD’s creative design used curves to navigate the current equipment as well as keep the stress on the pipe minimal. REDD enjoyed being flexible to ensure that the client was satisfied with the work.