Skip to main content
Home
Services
Construction Management
Engineering & Design
Process Safety
Turnaround & Commissioning
Projects
About Us
Home
Services
Construction Management
Engineering & Design
Process Safety
Turnaround & Commissioning
Projects
About Us
Mining & Minerals
Boosting Efficiency with Rapid Rail Stations and Next-Gen ANS Storage
REDD recently completed a major project in the Southwest, enhancing the efficiency of ANS handling at a local plant.
Read more
Precise Pipe Planning Powers Mountain West Mining Expansion
REDD provided engineering and design support to a Mountain West mining client for the installation of a new natural gas pipeline, spanning over 1000 feet across their facility
Read more
Strategic Silencers Streamline Mountain West Mining Operations
REDD collaborated with a Mining client in the Mountain West Area to design and engineer the installation of two Steam Silencers.
Read more
Rapid Response Reinforces Reliable Crusher and Conveyor Design
REDD provided a new crusher base and supporting conveyor system, ensuring dust control and structural integrity.
Read more
Sturdy Studies Strengthen Salt Suppliers Strategy
REDD performed an extensive study for a salt plant expansion, providing an accurate assessment of the existing facility and a clear plan to achieve both a safer and more profitable process.
Read more
Keeping Things Warm
A client needed to expand of their oil storage tanks, and upgrade their heating supply system at their Draper, UT plant. REDD was hired to create a new piping layout and design, as well as evaluate existing and new equipment requirements to determine the client’s thermal needs. REDD utilized an existing 3D point cloud, and a 2D location arrangement drawing. A system process diagram for the asphalt oil and thermal heating fluid systems was developed. Based on said diagram, a new drawing for the foundation locations of new and existing equipment was made. A new 3D piping model of the asphalt oil and thermal heating fluid systems was also created. The existing heater, new heater, and booster pump were then evaluated to make sure they met the needs of the client.
Read more
Load more
There is no more content to load